Skip to content
Cairns to Cape York

School playgrounds for Far North Queensland

Getting three quotes for a playground is hard this far north. Of the 13 suppliers holding a Far North Queensland allocation on DET 86552 PQP, only 2 are actually based in the region — the rest quote from Brisbane or New South Wales and add the trip north to your price.

We design, manufacture and install commercial playgrounds to AS 4685, with AS 4422 softfall — and we hand your principal a siting approval pack that's ready to submit rather than a pile of documents to chase.

What a school playground really costs

Fifteen completed departmental projects, with the numbers

If you're building a budget submission, this is the most useful table on the page. The median project came in at $116,700 ex GST.

Completed Department of Education playground projects and their costs, excluding GST
SchoolCost (ex GST)Scope
Prospect Creek SS$25,000Nature playground (school-delivered)
Jambin SS$39,000Nature playground (school-delivered)
Wowan SS$61,400New Kindy–Year 2 playground
Taranganba SS$67,500Middle-years playground upgrade
Denison SS$73,200Rubber softfall replacement only — no equipment
Emerald SS$76,000New upper-school playground
Bororen SS$90,700Create early-years playground
Mackay North SS$116,700Upgrade junior playground
Biloela SS$180,000Replace senior playground
Ambrose SS$190,300Upgrade playground (QBuild-delivered)
Emu Park SS$219,000Equipment repairs across three playgrounds
Thangool SS$293,000Prep–Year 6 playground (PM: GHD)
St Lawrence SS$451,700Playground upgrade (QBuild / Play Poles)
Homebush SS$480,900Adventure playground + hard shade structure
Marian SS$570,900Three playgrounds, Prep–Year 6 (PM: RP Infrastructure)

All figures ex GST, published by the Department of Education. These are whole-project costs — design, siting approval, demolition and disposal of the old equipment, drainage and landscaping, compliant softfall, shade and certification — not equipment prices. Denison State School is the one to look at: $73,200 for rubber softfall alone, with no equipment in it at all.

Comparing quotes

If our number looks low, here's why

A quote well under the figures above usually means one of two things: the supplier has priced a narrower scope, or their cost base is genuinely different. Ours is the second — and we'd rather show you the mechanics than leave you guessing.

We're a family business, not a national chain

No head-office overhead, no regional sales structure, no shareholders expecting a margin. The people who quote your playground are the people who build it.

No regional loading

There's a long-standing habit in this industry of quoting mining and regional Queensland higher simply because it's mining and regional Queensland. We don't. A playground in Mareeba is priced on what it costs to build in Mareeba.

One team, no project-management layer

Several of the department's larger projects carry an external project manager or QBuild margin on top of the contractor. We design, manufacture and install with one team, so that layer isn't in our price.

Travel shown, not buried

The department's own user guide tells schools to check that travel and transport costs are stated clearly in a quote. Ours are their own line — you can see exactly what the trip north costs, and it's the real cost.

Ask us for the itemised version and you'll get equipment, surfacing, site works, removal and disposal, certification and mobilisation as separate lines — so you can put our quote beside any other and compare the same things.

Procurement

You need quotes, not a particular supplier

DET 86552 PQP is not mandatoryfor Queensland state-owned educational facilities. What's required is the minimum number of written quotes for the value of the works:

Up to $10,000

1 written quote

$10,001 – $50,000

2 written quotes

$50,001 – $250,000

3 written quotes

Where most school playgrounds land

$250,001 – $500,000

4 written quotes

Over $500,001

Contact Procurement first

Procurement.BCM@qed.qld.gov.au advises before quotes are requested

One step catches most schools out: Queensland state schools must seek written approval from their Regional Facilities Manager before requesting a quote. Talk to us before that approval goes in and you'll have a realistic number to put in it.

Free download

The Siting Approval Pack

The Siting Approval Application asks for documents most schools can't produce on their own. Here's exactly what the form wants, who has to provide each piece, and which ones we hand over completed.

  • Playground design and specificationsWe supply

    Dimensioned 2D layout and 3D concepts, with a full equipment schedule.

  • Site layout plan with measurementsWe supply

    Measured setbacks from adjoining fences and buildings, exactly as section 3 asks for.

  • Statement of Compliance — DesignWe supply

    Signed confirmation the design complies with AS 4685.

  • Risk assessmentWe supply

    Drafted against the department's Making playground equipment safe fact sheet, ready for your Regional Senior Safety Advisor to review.

  • Statement of Compliance — InstallationWe supply

    Issued at handover, confirming the playground was installed per the approved design and AS 4685.

  • Softfall compliance evidenceWe supply

    AS 4422 test data showing HIC ≤ 1000 at the installed critical fall height.

  • Maintenance and inspection scheduleWe supply

    Covers the two detailed inspections per year the department requires post-installation.

  • OnePortal school facility mapSchool supplies

    Only the school can pull this from OnePortal — we'll tell you exactly what to mark on it.

  • Principal / Officer in Charge certificationSchool supplies

    Section 4 signature — yours to sign once the pack is assembled.

Send me the pack

A plain-English walkthrough of the Siting Approval Application, the AS 4685 and AS 4422 evidence your approval needs, the quote thresholds, and the departmental project costs to benchmark your budget against.

No spam — the pack, and we're here if you want to talk it through.

Our work

We already build in the far north

Wonga Beach State School north of Cairns, Palm Island for the Aboriginal Shire Council, and North West Queensland Indigenous communities — remote sites, freighted and installed.

Coverage

Where we work in the far north

CairnsGordonvaleInnisfailAtherton TablelandsMareebaMossmanPort DouglasWonga BeachCooktownWeipaThursday IslandCape York communitiesTownsvillePalm Island

Questions

What schools ask us

Do we have to use a supplier on DET 86552 PQP?

No. The department states plainly that the arrangement is not mandatory for Queensland state-owned educational facilities. What you do have to satisfy is your minimum quote requirement for the value of the works, plus siting approval and the AS 4685 compliance evidence. We quote against those requirements directly, and we reference the arrangement number on the quote where you ask us to.

Why is your quote lower than the departmental project costs we've seen?

Partly scope: published figures usually include things an equipment quote doesn't — an external project manager or QBuild margin, demolition and disposal, drainage and corrective landscaping, a hard shade structure. We quote the whole delivered scope so you can compare like for like. The rest is our cost base. We're a family-owned business with no head-office overhead and no shareholders taking a margin, and we don't apply the regional loading that gets added to mining and remote Queensland jobs as a matter of habit. A playground in Mareeba is priced on what it costs to build in Mareeba. Ask for the itemised quote and you'll see every line — and where we come in under budget, we'd rather show you what the difference buys than simply hand over a smaller invoice.

Can our P&C buy directly?

Yes. Queensland School Parent and Citizens Associations are explicitly listed among the parties that may use the arrangement, and P&C-funded projects generally have more freedom in how they procure. We supply the fixed-price quotes, specifications and concept images that grant and fundraising applications need.

What do we need before we can request a quote?

Queensland state schools must seek written approval from their Regional Facilities Manager before requesting a quote. It's worth doing that early — it's the step that most often holds a project up. We're happy to talk through scope and rough budget beforehand so your approval request has a realistic number in it.

Who signs off the playground before it can be built?

Siting approval runs through three departmental signatures: your Infrastructure Regional Senior Safety Advisor on the safety approval, the principal or officer in charge certifying the application, and the Infrastructure Advisor granting final approval. The application needs a risk assessment, a facility map, the playground design and specifications, a measured site layout plan and a Statement of Compliance — Design. Our Siting Approval Pack covers the supplier-side documents.

Do you travel to Cape York and the Torres Strait?

Yes. We've delivered at Wonga Beach State School north of Cairns, on Palm Island for the Aboriginal Shire Council, and for North West Queensland Indigenous communities. Remote work is costed openly — mobilisation, freight and accommodation appear as their own lines on the quote rather than being buried in the equipment price.

Can you handle softfall or repairs on their own?

Yes. Softfall replacement and equipment repair are standalone projects in their own right — the department's own examples include $73,200 for a rubber softfall replacement and $219,000 for equipment repairs across three playgrounds. We quote resurfacing to AS 4422 and repair work without requiring you to replace the whole playground.

What about shade?

The department advises budgeting for a hard shade structure where a playground doesn't have shade, and warns that a bigger playground means a bigger structure and a bigger budget. We'd rather raise that with you at concept stage than have it surface as a variation later, so shade is scoped and priced alongside the playground.

Be one of the three quotes

Free 2D and 3D concepts, an itemised fixed-price quote your business manager can take straight to budget, and the compliance documents your siting approval needs.