
Kidzspace Playgrounds · Brendale QLD
Every great playground starts with an empty patch of grass.
01 · Site prep
Scraped back and levelled.
The grass comes off and the ground is levelled to firm, bare soil before anything goes in.
02 · Softfall
It starts with the ground.
A compacted base, a shock pad, then a seamless wet pour top, so every fall lands soft.
03 · Frame & decks
Steel posts, set in concrete.
The frame goes up first, then the decks, the bridge and the barriers.
04 · Roofs
Shade in your colours.
Roofs and panels come in UV-stable colours to match your school, council or brand.
05 · Climbing & crawling
Then the fun goes on.
Net climbers, rock walls and a crawl tunnel give every age group a challenge.
06 · Play panels
The finishing touches.
Play panels, inspection and certification, then it's handed over, ready for play.
07 · Make it yours
Your playground, in your colours.
Pick your colours and surface and watch it change. We'll design yours in 3D, free.
Colour scheme
Frame
Surface
Get your free concept designor call 1300 543 977 · QBCC 15006840 · 3D credits
3D scene credits. Skid steer loader model “Skid Steer Loader” by doty_aecom, Sketchfab, licensed under CC BY 4.0; converted to metric scale, simplified and compressed. Sky, trees, bench and surface textures from Poly Haven and ambientCG (CC0). Illustrative 3D visualisation only; final designs, colours and surfacing are confirmed in your concept design.















