Skip to content
All projects
Case study

Peachster State School

Peachester, QLDSchool

11 photos

The brief

The team at Peachster State School set out to replace tired play equipment with something built for daily school use.

What we built

We designed, built and installed custom climbing playground. Every element was certified to AS 4685 with compliant AS 4422 softfall.

The result

The result is a safe, durable playground the school community can enjoy for years to come. From design to installation, the whole project was handled in-house by our team.

On site

  • Custom Climbing Playground
  • Designed, built and installed by our own team
  • Equipment certified to AS 4685; softfall to AS 4422
  • One of 1,000+ projects delivered across Australia

Want something like this?

Tell us about your site and we'll design a playground your community will love.

More of our work