Case study
Peachster State School
Peachester, QLDSchool
11 photos
The brief
The team at Peachster State School set out to replace tired play equipment with something built for daily school use.
What we built
We designed, built and installed custom climbing playground. Every element was certified to AS 4685 with compliant AS 4422 softfall.
The result
The result is a safe, durable playground the school community can enjoy for years to come. From design to installation, the whole project was handled in-house by our team.
On site
- Custom Climbing Playground
- Designed, built and installed by our own team
- Equipment certified to AS 4685; softfall to AS 4422
- One of 1,000+ projects delivered across Australia
Want something like this?
Tell us about your site and we'll design a playground your community will love.





